GMP IPO Watch logo GMP IPO Watch
P
Mainboard IPO LISTED BSE, NSE PRANAV

Pranav Constructions IPO

Pranav Constructions IPO details, live grey market premium (GMP), dates, price band, lot size, subscription & review.

Live GMP Today
₹50 +40.3%
Est. Listing: ₹174.00
Price Band
₹118 - ₹124
Per equity share
Lot Size
120 Shares
Min Invest: ₹14,880
Issue Size
₹351.03 Cr
Fresh: Approx ₹316 Crores
Issue Dates
6 September 2026 – 8 September 2026
Bidding period
Subscription
121x
Total overall demand

Pranav Constructions IPO Details

Key facts at a glance
IPO Open Date 6 September 2026 IPO Close Date 8 September 2026
Basis of Allotment 9 September 2026 Listing Date 14 September 2026
Price Band ₹118 - ₹124 per share Face Value ₹10 per share
Market Lot Size 120 Shares Min Investment (Retail) ₹14,880
Total Issue Size ₹351.03 Cr Issue Type Book Built Issue IPO
Fresh Issue Approx ₹316 Crores Offer for Sale (OFS) ₹35.03 Cr
Listing At BSE, NSE Issue Category Mainboard Issue
Registrar KFin Technologies Ltd.

Pranav Constructions IPO Timetable (Tentative Dates)

Event Tentative Date Status
IPO Open Date 6 September 2026 Confirmed
IPO Close Date 8 September 2026 Confirmed
Basis of Allotment 9 September 2026 Tentative
Initiation of Refunds 11 September 2026 Tentative
Credit of Shares to Demat 11 September 2026 Tentative
IPO Listing Date 14 September 2026 Tentative
Cut-off time for UPI Mandate Confirmation 5:00 PM on Closing Day Deadline

* Note: Timelines are tentative and subject to regulatory confirmation. UPI mandate approvals must be completed by 5:00 PM on the IPO closing day.

Pranav Constructions IPO Lot Size & Investment Details

Application limits for Retail and HNI investors
Application Category Lots Shares Amount (at Cut-off)
Retail (Min) 1 Lot 120 Shares ₹14,880
Retail (Max) 13 Lots 1,560 Shares ₹1,93,440
S-HNI (Min) 14 Lots 1,680 Shares ₹2,08,320
S-HNI (Max) 67 Lots 8,040 Shares ₹9,96,960
B-HNI (Min) 68 Lots 8,160 Shares ₹10,11,840

Pranav Constructions IPO Live GMP & Movement History

Daily unofficial grey market trends
Current Grey Market Premium

₹50 +40.3%

Estimated Listing Price
₹174.00
Date IPO GMP (₹) Estimated Listing Price Estimated Listing Gain (%)
9 Sept 2026 ₹44 ₹168.00 +35.48%
7 Sept 2026 ₹44 ₹168.00 +35.48%
6 Sept 2026 ₹37 ₹161.00 +29.84%
Disclaimer: Grey Market Premium (GMP) figures are purely unofficial and indicative rates traded in the unregulated grey market. GMP is highly volatile and does not guarantee the actual listing price. Always consult a SEBI registered investment advisor before bidding.

Pranav Constructions IPO Subscription Status

Demand breakdown by investor category
Retail
43.32x
QIB
258.71x
NII / HNI
208.21x
Total
121.00x

Pranav Constructions Company Financials

Restated figures (₹ in Crores)
Period Total Assets Total Revenue Total Expenses Profit After Tax (PAT)
2023 — ₹184.81 ₹154.97 —
2024 — ₹206.45 ₹175.85 —
2025 — ₹322.58 ₹261.43 —
Dec 2025 — ₹236.50 ₹186.96 —

* Amounts reported in ₹ Crores as sourced from company regulatory filings (RHP/DRHP).

Pranav Constructions IPO Valuation & KPIs

Key metrics pre-issue
EPS
8.18 (Basic)
P/E Ratio
N/A
RoNW
33.78%
NAV per share
₹28.30
RoCE
24.34%
RoE
33.78%
Debt to Equity
1.08
PAT Margin
9.37%
EBITDA Margin
17.18%

Pranav Constructions Peer Group Comparison

Listed industry peers
Company Name P/E EPS (₹) RoNW (%) NAV (₹) Total Income
Powerica Limited — 15.26 — — —
Cummins India Limited — 72.15 — — —
Kirloskar Oil Engines Limited — 33.71 — — —
NTPC Green Energy Limited — 0.67 — — —
Acme Solar Holdings Limited — 4.55 — — —
Adani Green Energy Limited — 8.37 — — —

About Pranav Constructions

Pranav Constructions is a pure-play real estate developer based in Mumbai, predominantly undertaking redevelopment projects in the Western Suburbs, focusing on economical, mid-range, mass, and aspirational homes. The company’s core business involves entering into redevelopment agreements with Co-operative Housing Societies to acquire redevelopment rights, followed by the demolition of existing structures and the construction of new premises. It generates revenue primarily through the sale of additional units and constructed area to both the existing members of the housing societies and to new customers. By securing these rights and executing the developments, the company manages the entire project lifecycle and utilizes pre-sales of these units to fund its ongoing working capital requirements during the construction phase.

Key Strengths

  • Leading real estate redeveloper in Mumbai’s Western Suburbs.
  • Consistent track record of procuring housing society projects.
  • Demonstrated history of timely project completion.
  • Efficient model utilizing pre-sales for working capital.
  • Strong brand recall in key micro-markets.

Key Risks

  • Revenue is highly concentrated in Mumbai’s Western Suburbs.
  • Project delays can lead to penalties and compensation costs.
  • Highly dependent on limited third-party suppliers and contractors.
  • Escalating property prices could reduce affordability and sales.
  • Liquidity risks exist if pre-sales or financing decline.

Pranav Constructions IPO Reservation & Share Quotas

The Pranav Constructions IPO reservation is divided among anchor investors, qualified institutional buyers (QIB), non-institutional investors (NII), and retail investors. Retail investors have the largest reservation at 45% of the offered shares.

Investor Category Share Offered % Shares
Anchor Investor 67,94,034 Shares 24%
QIB (Ex. Anchor) 45,29,358 Shares 16%
NII Shares Offered 42,46,272 Shares 15%
Retail Shares Offered 1,27,38,816 Shares 45%
Note: The IPO reservation percentages and share quantities are based on the provided Pranav Constructions IPO details and may be updated in the final offer documents.

Pranav Constructions IPO Anchor Investors

The Pranav Constructions IPO anchor investors portion was offered ahead of the public issue. A total of 67,94,034 shares were allocated to anchor investors, with the anchor bidding scheduled for September 4, 2026.

Particular Details
Anchor Bidding Date September 4, 2026
Shares Offered 67,94,034 Shares
Anchor Size ₹84.25 Cr.
Lock-in End Date – 50% Shares (30 Days) October 10, 2026
Lock-in End Date – 50% Shares (90 Days) December 9, 2026
Note: Anchor investor allocation and lock-in details are based on the provided Pranav Constructions IPO information. The anchor investor list can be viewed in the linked PDF.

Pranav Constructions IPO Important Dates

Particular Dates
IPO Open Date 07 Sept 2026
IPO Close Date 09 Sept 2026
Basis of Allotment 10 Sept 2026
Refunds 11 Sept 2026
Credit to Demat Account 11 Sept 2026
IPO Listing Date 15 Sept 2026

Note: The timeline for ପ୍ରଣବ କନଷ୍ଟ୍ରକସନ୍ IPO is tentative and subject to change.

Pranav Constructions Promoters and Shareholding Pattern

The promoters of Pranav Constructions are Pranav Kiran Ashar and Ravi Ramalingam. The promoter holding is expected to reduce after the IPO, while the shareholding of other shareholders increases following the issue.

Particular Pre IPO Shares Pre IPO % Shares Post IPO Shares Post IPO % Shares
Promoter and Promoter Group 5,52,19,345 63.35% 5,23,62,476 46.49%
Others* 3,19,51,825 36.65% 6,02,60,306 53.51%
Total 8,71,71,170 100% 11,26,22,782 100%
Note: The holding pattern shows the promoter and promoter group shareholding before and after the IPO. “Others*” represents shareholders other than the promoter and promoter group.

Pranav Constructions Objects of the Issue & Utilisation of Proceeds

Purpose Crores
Purpose Crores
Funding costs towards obtaining government and statutory approvals and purchase of additional FSI and cost towards Compensation to members towards alternate accommodation, and hardship compensation, in relation to the development of certain of the Under-construction Redevelopment Projects, and certain of the Upcoming Redevelopment Projects (Funding Redevelopment Expenses). ₹145.72
Repayment and/ or pre-payment, in full or part, of certain borrowings availed by the company. ₹91.50
Funding acquisition of future redevelopment projects and general corporate purposes. ₹-

Note: Objectives are as specified in the DRHP/RHP documents of ପ୍ରଣବ କନଷ୍ଟ୍ରକସନ୍.

Pranav Constructions About the IPO


Pranav Constructions, founded in July 2003, is a real-estate firm that focuses on the redevelopment of old buildings and properties in Mumbai. Rather than building new properties on new land, Pranav Constructions is mainly involved in the redevelopment or renovation of old existing properties into new ones. 


It works on different types of housing, including Economical homes, Mid/Mass homes, and Aspirational homes. As of March 2026, the firm had 65 redevelopment projects in the Mumbai MCGM area, of which 28 projects are completed, 20 projects are under construction, and 17 projects are upcoming. The company mostly handles the execution of its redevelopment model itself, from tendering, pre-construction, construction, and post-construction activities.

Pranav Constructions Company Financial Report

Period Revenue Expense PAT Assets
2023 ₹184.81 ₹154.97 - -
2024 ₹206.45 ₹175.85 - -
2025 ₹322.58 ₹261.43 - -
Dec 2025 ₹236.50 ₹186.96 - -

Note: Financial numbers for ପ୍ରଣବ କନଷ୍ଟ୍ରକସନ୍ are in ₹ Crores unless stated otherwise.

Pranav Constructions Company Valuation & Key Performance Indicators

KPI Values
ROE 33.78%
ROCE 24.34%
EBITDA Margin 17.18%
PAT Margin 9.37%
Debt to Equity Ratio 1.08
Earning Per Share (EPS) 8.18 (Basic)
Price/Earning P/E Ratio -
Return on Net Worth (RoNW) 33.78%
Net Asset Value (NAV) 28.30

Note: Valuation KPIs for ପ୍ରଣବ କନଷ୍ଟ୍ରକସନ୍ are computed for FY2026.

Pranav Constructions Peer Group Comparison

Company EPS PE Ratio RoNW % NAV Income
Powerica Limited 15.26 - - - -
Cummins India Limited 72.15 - - - -
Kirloskar Oil Engines Limited 33.71 - - - -
NTPC Green Energy Limited 0.67 - - - -
Acme Solar Holdings Limited 4.55 - - - -
Adani Green Energy Limited 8.37 - - - -

Note: Peer group comparisons for ପ୍ରଣବ କନଷ୍ଟ୍ରକସନ୍ are sourced from DRHP filings.

Pranav Constructions Lead Managers & Merchant Bankers

  • Centrum Capital Ltd.
  • PNB Investment Services Ltd.

Pranav Constructions IPO FAQs

Pranav Constructions IPO opens for subscription on 6 September 2026 and closes on 8 September 2026.

The price band for Pranav Constructions IPO is set at ₹118.00 to ₹124.00 per share.

The minimum market lot size is 120 shares. A retail investor can apply for a minimum of 1 lot requiring an investment of 120 Shares (₹14,880).

The latest Grey Market Premium (GMP) for Pranav Constructions IPO is ₹50. GMP represents the unofficial premium at which shares trade prior to listing.

The basis of allotment for Pranav Constructions IPO is tentatively scheduled for 9 September 2026, and shares are expected to list on the stock exchanges on 14 September 2026.

KFin Technologies Ltd. is the official registrar for Pranav Constructions IPO. Investors can check their IPO allotment status directly on the registrar's portal once finalized.

IPO Registrar

KFin Technologies Ltd.

Responsible for allotment finalization and demat credit processing.

Check Other IPOs
RECOMMENDED BROKER

Open Demat Account to Apply

Apply seamlessly for Mainboard and SME IPOs via UPI through Zerodha with 1-click mandate verification.

Open Demat on Zerodha

Track Live GMP Updates

GMP is updated multiple times daily as market sentiment shifts. Bookmark this page or visit regularly for real-time rates.

Return to Homepage
Market Open · Closes 3:30 PM
NSE BSE NFO BFO CDS BCD MCX NSCOM